Here are some newer photos of Los Angeles' Eastside Gold Line as it nears opening (also see construction photos from early 2008).
This aerial view of the bridge from Union Station over the 101 freeway is from Metro's headquarters building (8/08).
A test train returns over that freeway bridge to the Gold Line platform at Union Station (7/09).
(Click photos to enlarge, or see Light Rail Big Photos for all large photos.)
Another view of that bridge, from Aliso Street on the south side of the freeway (12/08).
Two test trains are in the Little Tokyo station at First and Alameda.
A three-car eastbound test train crosses the First Street bridge. Note the bridge tower has been moved as part of its widening (9/09).
A one-car westbound test train crosses the bridge (9/09).
A test train passes the new school LAUSD built next to the Eastside Gold Line at Mission (9/09).
An older Siemens test car pauses in the station (with its lights briefly showing it to be westbound) before heading east into the tunnel under Boyle Heights (9/09).
An eastbound test train rounds the corner of First onto Indiana (9/09).
This catenary pole on Third Street includes weights to keep the overhead in tension (12/08).
This test train is about to leave the end-of-the-line station at Atlantic (9/09).
Here's the map of the 6 mile long Eastside Gold Line.
Saturday, September 19, 2009
Eastside Gold Line testing
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment